Back

Production building and warehouse complex for beet processing

The project task was to realize 4 hangars intended for different use by connecting them together for providing a common manufacturing process (production, warehouses, administrative bodies, etc.).

Metal construction hangars were realized within the framework of  BIM (Building Information Modeling) system. PICHE as the main general contractor, within the prescribed period (only 6 months), carried out the design works and the following construction  works. The construction works for the General contractor covered the full project starting from 0 cycle,  metal constructions –  up to the networks and improvement works. 

The PICHE experience in designing hangars of such metal constructions  and subsequent construction which included also the BIM system made it possible to implement this project in such a short time and in such a good quality that received positive feedback from the Customer of the project.

If you were interested in this project, we encourage you to view another agricultural production complex that we’ve completed. In About us section you can find more information about our services.